My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-09_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-09_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 12:19:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/9/2003
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 15 Page 2 003-2203 <br />Ames continued placement of Structural Fill (SF) in the Phase ]Vb azea, placing SF on the Substation <br />Bill south slopes. Ames also continued slope recontouring and re-compaction on Substation ffill and <br />Raven Hill, upslope of the PSSA. <br />Ames continued Drain Cover Fill (DCF) removal near the Phase III /Phase IVb PSSA tie-in in <br />prepazation for east end berm and Phase IVb OSA construction. <br />Ames completed set up of the DCF screen plant near the secondary crusher. No ore material was <br />screened through the plant during this reporting periad. <br />Ames excavated and constructed approximately 160 feet of Primary Underdrain on the west and south <br />slope of Substation I3'ill in the Phase IVb azea. <br />Ames excavated and constructed approximately 650 feet of Leak Detection Trench on the west and <br />south slope of Substation Bill in the Phase IVb azea. <br />Ames placed Low Volume Solution Collection Fill (LVSCF) onto the 2:1 riser slope. <br />Poly-Flex continued deployment of 100-mil double-sided smooth (upper) LLDPE geomembrane in the <br />Phase IVb PSSA Poly-Flex deployed 100.mi1 smooth LLDPE geomembrane over an azea of <br />approximately 371,395 squaze feet in the Phase IVb PSSA during this reporting period. Geomembrane <br />panels U-115 through U-252 were deployed, seamed, and pressure tested by Poly-Flex. Destructive <br />fusion seam samples DFu-36 through DFu-75 were marked and removed. Destructive fusion seam pee] <br />and sheaz tests of samples DFu-17 through DFu-68 were performed and passed per project <br />specification. <br />Poly-Flex resumed deployment of 100-mil single-sided textured (lower) LLDPE geomembrane in the <br />Phase Nn PSSA. Poly-flex depioyed i0G-mii smooth LLDPE geomembrane o-ver an area of <br />approximately 53,208 square feet in the Phase IVb PSSA lower geomembrane during this reporting <br />period. Geomembrane panels L-561 through L-585 were deployed, seamed, and pressure tested by <br />Poly-Flex Destructive fusion seam samples DF-153 through DF-158 were mazked. <br />Phase IVc <br />Ames resumed limited cut to fill and cut to temporary stockpiling activities within the limits of the <br />Phase IVc area. Ames hauled Structural Fill (SF) material from the Phase Nc azea to temporary <br />stockpiles on Chicken Hawk Hill and in the Saddle Fill. <br />Field Monitorine and Testing Activities <br />Golder observed construction activities associated with Phase N earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized or deleterious material from all fill <br />azeas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />rmx rvciswym-mev3, zoo3 a« Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.