My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-09_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-09_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 12:19:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/9/2003
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__ Golder <br />ASSOClc'I.tCS <br />May 6, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. {~~C~fVE~ <br />44 Union Boulevard, Suite 300 AY O 9 2403 <br />Lakewood, CO 80228 M <br />(303)980-0450 <br />(303) 985-2080 Division ~i Minerals and Geology <br />Golder Project No.: 003-2203 <br />RE: Summary No. 15: April 27 through May 3, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of April 27 <br />through May 3, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 24° F to 36° F, and highs ranged from 44° F to 54° F. Snow was recorded <br />on May 2. Weather observations were made on seven days of this seven-day reporting period. <br />Construction Svnonsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase Nb and c construction activities on six days of this seven-day <br />reporting period (April 28 through May 3, 2003). Poly-Flex conducted Phase Nb construction <br />activities on seven days of this seven-day reporting period (April 27 through May 3, 2003). <br />Phase IVb <br />Ames continued to haul and place Soil Liner Fill (SLF) in the Phase Nb PSSA and OSA area for <br />construction of the east PSSA end berm and north primary anchor trench. Ames moisture-conditioned <br />and compacted the SLF placed on the west slope of Substation Hill. <br />Ames continued excavation of the upper Phase Nb PSSA geomembrane primary anchor trench and the <br />lower secondary anchor trench, excavating approximately 400 feet of northern primary anchor trench, <br />and approximately 650 feet of southeast secondary anchor trench. <br />
The URL can be used to link to this page
Your browser does not support the video tag.