Laserfiche WebLink
CIRCES Cost Estimatlng Software <br />Task # : 001 <br />Date : 06/05/2003 <br />Usar : ESC <br />State :Colorado PermiUjob# : M-1985-184 <br />County :Lorimer Abbreviation :none <br />Site :Killion Supply Filename :M184-0O1 <br />Agency or organization name :Division Of Minerals & Gec <br />Permit or other job action :TR-01 <br />Task description :Reclaim Concrete in <br />HOURLY EQUIPMENT COST <br />Pit <br />Basic machine :Cat DSR Series !1- BSU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank dpper <br />Utilization <br />Cost Breakdown : Ownership cosf/hour : $51.57 NA <br />Shift basis : 1 per day <br />Data source : (CRG) <br />------ -- - Ripper op.cosUhour: $0.00 0 ---------- <br />Operator cosUhour : $30.65 NA <br />Total unit cosUhour : $146.15 Total fleet cosUhour : $146.15 <br />Initial <br />volume : 20,000 <br />LCY <br />Swell Loose <br />factor : NA volume : 20,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br />Average push distance : l00 feet <br />Unadjusted howdy production : 852.6 LCY/hr <br />Material consistency description <br />Rock, goody ripped or blasted <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Slag -broken <br />0.00 % (I <br />5,500 feet <br />2,950 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.920 /LCY <br />Horsepower: 310 <br />Operator skill : 0.60 <br />Material consistency : 0.60 <br />Dozing method : 1.00 <br />Visibility : f.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1,00 <br />Altitude : 1.00 <br />Material weight ; 0.78 <br />Blade type : 1.00 <br />Net cortection : 0.19 <br />Adjusted unit production : 158.84 LCY/hr <br />Adjusted fleet production : 158.84 LCY/hr <br />Total job time : 125.91 Hours <br />Total job cost : $18,402 <br />