Laserfiche WebLink
CIRCES Cost Estimating Software <br />P~tOJECT IDENTIFICATION <br />,. <br />HOURLY EQUIPMENT COST ,; , <br />" ` <br />°'"° <br /> Basic machine :Cat D8R Series II - SSU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Rttachment no. t : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization °k <br />Cost Breakdown • Ownership costlhour : $51.57 Nq <br />-_--._. - ______-_ O eratin c st/hour : 63.93 100 _ <br /> <br />Ripper op.cosUhour <br />: $0.00 <br />0 ____ _____ <br /> Operator cosUhour : $30.65 NA <br /> Total umt cosUhour : $146.15 Total fleet cosUhour : x146.15 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 5,000 LCY factor : NA volume : 5,000 LCY <br />Source of estimated volume :Operator EsBmate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION -'° <br />Job Condition Correction F <br />t s.„s' <br />- <br /> ac <br />ors Source <br /> <br />Average <br />ush di <br />t Operator skid : 0.60 (poor) <br />p <br />s <br />ance : 100 feet Material consistency : 0.60 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> <br />Material consistency description : Visibility : 1.00 (avg.) <br /> <br />Rock, poorly ripped or blasted Job efficiency : 0.83 (lshiff/day) <br /> Spoil pile : 0.80 (fnd-r~ <br /> <br />Avera <br />e <br />h <br />i Push gradient : 1.00 (Cat HB) <br />g <br />pus <br />grad <br />ent : 0.00 % (pos) <br /> <br />Aver <br />it Altitude : 1.00 (Cat HB) <br />age s <br />e altitude : 5,500 feet Material weight : 0.78 (Cat HB) <br /> <br />M <br />t <br />i <br />l <br />i Blade type : 1.00 (S/SU/U) <br />a <br />er <br />a <br />ght : <br />we 2,950 Ibs/LCY Net correction : 0 <br />19 <br />Weight description . <br />Slag -broken Adjusted unit production : 158 <br />84 <br /> . <br />LCYlhr <br /> Adjusted fleet production : 158.84 LCY/hr <br />J08 TIME AND COST ._ , . ,. _. ,..... . <br />Fleet size : 1 Dozers) Total job time : 31.48 Hours <br />Urnt cost : $0 920 /LCY Total 'ob cost : <br />1 <br />$4 <br />600 <br />