My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-02-20_REVISION - M1996089
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996089
>
2002-02-20_REVISION - M1996089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:41 AM
Creation date
11/21/2007 12:03:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996089
IBM Index Class Name
Revision
Doc Date
2/20/2002
Doc Name
Notice of Bond Increase
From
DMG
To
Skoglund Excavating Inc.
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 02/20/2002 <br />User: RCO <br />CIRCES Cost Estimating Software <br /> <br />State : Colorado PermiUjob# : M-1996-089 <br />County Saguache Abbreviation :none <br />Site : Skoglund Pit Filename : M089-003 <br />Agency or organization name : DMG <br />Permit or other job action :Bond review <br />Task description :Rough grade and rip compaction, floor and road, 4 ac <br />n-_'__,~-~~. _ .-_--- <br />HOURLY EQUIPMENT COST <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Cat D8R - 8SU <br />Semi-Universal <br />ROPS Cab <br />3-shank upper <br />Horsepower: 305 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $49.50 NA <br />Operating cosUhour : $65.98 100 <br />Ripper op. cosVhour : $7.50 100 <br />Operator costthour : $27.99 NA <br />Total unit cosUhour : $150.97 Total fleet cosVhour : $150.97 <br /> <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,453 CCY factor : 1.165 volume : 7,518 LCY <br />Source of estimated volume :approved plan, annual report maps, 11/01 inspec <br />Source of estimated swell factor : n/a <br />° f <br />.. _ <br />( <br />. __ _ <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 60 feet <br />Unadjusted hourly production : 1,246.9 LCY/hr <br />Material consistency description : <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7, 740 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock. 50% Earth <br />JOB TIME AND COST <br />Fleet size 1 Dozers) <br />Unit cost : $0.389 /LCY <br />Operator skill : 0.75 (ae <br />Material consistency: 0.90 (Cat <br />Doling method : 1.00 (ge <br />Visibility : 1.00 (a~ <br />Job efficiency: 0.83 (l shit <br />Spoil pile : 0.70 (fnd <br />Push gradient: 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.79 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.31 <br />Adjusted unit production : <br />Adjusted fleet production : 387.89 <br />387.69 LCY/hr <br />LCYthr <br /> <br />Total job time : 19.39 Hours <br />Total job cost : $2,928 <br />.._...-_~_.__..~~ _. 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.