My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-02-20_REVISION - M1996089
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996089
>
2002-02-20_REVISION - M1996089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:41 AM
Creation date
11/21/2007 12:03:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996089
IBM Index Class Name
Revision
Doc Date
2/20/2002
Doc Name
Notice of Bond Increase
From
DMG
To
Skoglund Excavating Inc.
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 02/20/2002 <br />User : RCO <br />U <br />State :Colorado Permit/job# : M-1996-089 <br />County : Saguache Abbreviation : none <br />Site : Skog/und Pit Filename : M089-002 <br />Agency or organization name : OMG <br />Permit or other job action :Bond review <br />Task description :Rough grade toe of <br />HOURLY EQUIPMENT COST <br />and road, spread pitrun on floor <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab -:Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> utilization °!° <br />Gost Breakdown : Ownership cost/hour : $49.50 NA <br />OperatingcosUhour : $65.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cost hour : $143.48 Total fleet cosUhour : $143.48 <br />i <br />._ <br />_J <br />1.~ <br />~ ._. <br />_ <br />.... <br />_ <br />__~ <br />-,~ <br />MATERIAL QUANTITIES _ <br />._ <br />Initial Swell Loose <br />volume : 807 LCY factor : NA volume : 807 LCY <br /> <br />Source of estimated volume :Assume 0.5 ac area x 6" <br />Source of estimated swell factor : n/a <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description ; <br />Partly consolidated stockpi/e <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7, 740 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description ~. <br />Decomposed rock - 75% Rock, 25% Earth <br />L. ~u ~.~_- ------ - -- <br />JOB TIME AND COST <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.38 <br />Source <br />Adjusted unit production : 534.33 LCY/hr <br />Adjusted fleet production : 534.33 LCYlhr <br />.~.~ _~. <br />Fleet size : 1 Dozers) Total job time : 1.51 Hours <br />Unit cost : $0.269 /LCY Total job cost : $211 <br />-- - - -. ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.