Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 02/20/2002 <br />User: RCO <br />rd. W hiai <br />Agency or organization name : DMG <br />Permit or other job action :Bond review <br />Task description :Spread topsoil on <br />(~. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R - 8SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Shin basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $49.50 NA <br /> Operating cost/hour : $65.98 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost hour : $27.99 NA <br /> Total unit cost hour : $143.48 Total fl eet cosVhour : $143.48 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,033 CCY factor : 1.125 volume: 4,537 LCY <br /> <br />Source of estima ted volume : 5 ac x 6" minimum depth, approved rec/am plan <br />Source of estimated swell factor : n/a <br /> ~~__~__ <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Conso/idated stockpile Spoil pile : 0.70 (fnd-mt) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,740 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.44 <br />Weight description <br />Earfh - Orv packed <br />i_. _-_... ~--- :__ -- <br />JOB TIME AND COST ~J ~ __._ <br />Fleet size : 1 Dozers) <br />Unit cost: $0.516 /LCY <br />State : Colorado Permit/job# : M-1996-089 <br />County : Saguache Abbreviation :none <br />Site : Skoglund Pit Filename : M089-004 <br /> <br />re, 5 ac <br />Horsepower: 305 <br />Adjusted unit production : 277.97 LCY/hr <br />Adjusted fleet production : 277.97 LCYlhr <br />Total job time : 16.32 Hours <br />Total job cost : $2,342 -7 <br />