Laserfiche WebLink
Northern Colorado Constructors, Inc. <br />~' JxT Consulting, Inc. <br />NCC l ~'~I ° t <br />~_k!H:'IiU, <br />Reclamation Bond (]uan6tics and Coals tpv <br />~_i;~v~ ~~'1 Consult) np, loc. ,rn a. acu r•Itv~a+M C»:.. <br />Summary of Unit Costs from Tschnlcal Revision ~2 <br />IfRCLCOSIs <br />Re-applying topsoil 12" Ihlck <br />Revogelating dlsturbod area <br />Dewatonng lull pit <br />Lmer Cost (see breakdown below) <br />Mobdizauon <br />in r _g~l Breakdown <br />Ripping Clay and Shale <br />Hauling and placement of clay <br />Hauling and ptacemenl of overburden <br />Blending and moisture condtl~oning <br />Compaction to desired density <br />QA/pG <br />Ov rhead and Pr fi Cgs <br />Liability insurance <br />Pedomranco bond <br />Prefit <br />PrgLcl A9Tnp~~ment <br />Engmewring and bidding <br />Management and admmistrahon <br /> 52.178.IX1 !acre <br /> 5820,00 !acre <br /> 5201.50 / million gallons <br /> 559.36 !hnoar foot <br /> 52.500 lump sum <br /> 57.12 /hnoar foot <br /> 516.46 +bnear Iool <br /> 55.94 +bnear tool <br /> 511.80 ~ linear foot <br /> 517.-03 . bnear (oot <br /> 50.61 ~ iinear foot <br />Total Liner Cosl 559.36 ~ bnear foot <br /> 1 55"0 of direct cost <br /> 1.05°io Of direct rASI <br /> t 0.U0go of direct cost <br />Total Overhead COST 12.609; of direct cost <br /> 4.25°/o Of direct COST <br /> 5 t)~°'o Of drect COSt <br />Total Additional COST 9.25°6 of direct cost <br />Additional Unlt Costs <br />~,r;~~~ , ~;n~e~,d <br />5200 I acre <br />