Laserfiche WebLink
NCCI Pe tt r, Technko! Revision No 3 Requesr. Fife No M•2001 • f07 10/9/06 <br />•3- <br />Attached is a summary of the unit costs used in calculating the required financial warranty for <br />each phase of mining, which were taken from Technical Revision #2, and the required financial <br />warranty calculations for each phase. <br />An additional unit cost was added for "scarifying ground" for use m the required financial <br />warranty calculations. Because the crushing and screening area has been relocated to the <br />phase 7 area, and because topsoil stockpiles are now present in the phase 6 area, this <br />additional unit cost was required to calculate the financial warranty required for each phase until <br />the mining in phases 6 and 7 is commenced. <br />NCCI appreciates your consideration of this revision request and looks forward to your <br />response. <br />Please feel free to contact me with any questions or comments. <br />Sincerely, <br />Todd Yee ; <br />J&T Cotosultlng, Ina <br />Surnmarv of Attachments. <br />Revrsed Mmmg Plan Map <br />Revised Reclamation Plan Map <br />Summary of Technical Revision tt2 Und Costs <br />Revised F~nancral Warranty Reqwrement Calculations <br />Stt38 Check for Tochmcal Revision review fee <br />Cc- Northern Colorado Constructors, Inc <br />Fde <br />JtT COnsultltag, Irfc. • 1400 W 122°' Avenue - Surte t20 • 'Nestminster CO ti02:4-3 • 303-457-0735 <br />