Laserfiche WebLink
Pit inflows will be monitored and evaluated also as a part of the <br />annual report. In addition, as discussed in the approved permit, these <br />inflow results will be submitted to the Division on a quarRerly basis. <br />In the event of a spill, the Emergency Response PLanirequires that <br />BMR notify the MLRD as soon as possible. Details for spill Monitoring and <br />reporting will be determined with the MLRD on a case by cafe basis. <br />Results of the soils testing and the EP toxicity t sting will be <br />submitted to the Division as soon as the results are avail ble. <br />Table I presents a summary of all monitoring require for the San <br />Luis Project. <br />