Laserfiche WebLink
Section of Permit <br />D.2.6 (M-88-112) <br />E.2.4 (M-88-112) <br />G.1 (M-88-112) <br />G.1 (M-88-112) <br />G.1 (M-88-112) <br />monitored monthly <br />G.1 (M-BB-112) <br />G.2.5 (M-88-112) <br />D.6 (Amendment) <br />E.2 (Amendment) <br />Appendix M <br />~~ <br /> TABLE 1 <br />MONITORING REQUiRFMENTS AND FREQUENCY <br />Item Monitored Monitoring Freguencv Resorting Requirements Reoorting Freguencv <br /> <br />Pit Inflows Daily MLRO Quarterly and in <br /> annual report <br />Soils Once at reclamation MLRD At reclamation <br />Surface Mater Daily during runoff, MLRD Annual report <br />Quantity weekly during base flow <br />Surface Water Monthly during runoff, MLRD Annual report <br />Quality quarterly rest of year <br />Groundwater quarterly, wells in MLRD Quarterly and in <br />Levels tailings vicinity annual report <br />Groundwater quarterly, wells in MLRD Quarterly and in <br />Quality tailings vicinity annual report <br /> monitored monthly <br />Surface Water Sediment Grab MLRD Annual report <br />Sediment Sampler <br />Tailings Monthly MLRD Annual report <br />Pond Sludge At reclamation MLRD At reclamation <br />Spill To be determined MLRD As need _ <br /> 6~a ase y case as s <br />Note: Any observations which differ significantly from baseline or expected conditions will be reported to the <br />MLRD as soon as the results are available. <br />