Laserfiche WebLink
2.7 Miscellaneous Monitoring <br />Miscellaneous monitoring to be required for ithe San Luis <br />Proje~et includes monitoring required primarily for reclamation. <br />Testing of the reclamation soils will be performed toldetermine any <br />amendments that might be required. This testing will' be performed <br />at the time that the soils are to be used for reclamation. <br />Other testing includes performing an EP toxicit~ test on any <br />sludge present in the collection pond upon completion oi` operations. <br />3.0- Reoortina Requirements <br />All monitoring data collected will be reviewed by, a qualified <br />individual. Data collected on the tailings disposal area wild be reported <br />to a professional engineer familiar with the design and operation of the <br />facilities. This engineer will compare and evaluate the recorded monitoring <br />against anticipated performance of the tailings disposal area. When <br />significant variation from anticipated performance is d~tected, the <br />engineer will notify the design engineer who will estabhish whether <br />modifications to the design or remedial measures are requi~ed. The-data~~,, <br />collected as part of the tailings monitoring program will be ompiled into <br />an annual report for submittal to the MLRD. Any significant va~iation which <br />could affect tailings operation or stability will be reporte~ to the MLRD <br />as soon as the data is obtained and BMR will work with the M~RD to obtain <br />approval for any required modification to the approved plan.. <br />Surface and groundwater monitoring results will be compiled and " <br />evaluated as part of the project's annual report. As part oflthe approved <br />permit BMR committed to monitoring groundwater in wells adjacent to the, <br />heap leach facility on a monthly basis and submitting the results as they <br />became available. This program will be applied to the taili gs disposal,' <br />facility and the groundwater wells in the vicinity of the tailings disposal <br />area will be monitored monthly with the results reported monthly. In <br />addition, any significaat changes in the monitoring resutits will be <br />reported to the MLRD as soon as these results are available. <br />