My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28729
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:56 PM
Creation date
11/21/2007 12:02:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Name
MONITORING REQUIRMENTS SUMMARY SAN LUIS PROJECT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a laboratory for .nalyses of the parametzrs listed inn Table G.l-2 <br />of the approved permit. <br />Two single stage sediment samplers are located at each station <br />to measure sediment flow. These results are analyzed~as frequently <br />as necessary based on storm flows. <br />An extensive analysis of the monitoring results will be <br />performed annually. Less extensive analyses will be p~rFormed more <br />frequently. The surface water program will be re-eval~ated annually <br />to ensure that the monitoring program and sampling requency are <br />adequate. <br />2.5 Pit Inflows, <br />The south wall of the West Pit will experience some seepage <br />toward and into the pit from the Rito Seco through) the surface <br />alluvium, if exposed during the mining operations, an~ to a lesser <br />extent the Santa Fe Conglomerate. The extent of the surface alluvium <br />along the south wall cannot be determined until mining exposes this <br />area. As discussed in the approved permit, during mining operations <br />the seepage into the pit through the Santa Fe Conglomerate will be <br />monitored for quantity to verify the groundwater conditions and the <br />expected post-mining conditions. <br />2.6 Spill Response Monitoring <br />Spill response monitoring is detailed in the SaniLuis Project <br />Emergency Response Plan. The spill response monitarin~ for the San <br />Luis Project will be determined on a case by case basis ~n accordance <br />with the guidelines established in the approved Emergency Response <br />Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.