My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28729
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:56 PM
Creation date
11/21/2007 12:02:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Name
MONITORING REQUIRMENTS SUMMARY SAN LUIS PROJECT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
established in the pit area. ~~1ost or these wells will be <br />mined out during the life of the project. Tjhe monitoring <br />frequency is presented on Table G.1-3 of the approved permit. <br />The water levels in monitor wells will be measured on~ <br />a quarterly schedule. <br />Samples of groundwater will also ~be ollected for ' <br />laboratory analysis quarterly. The parameters in luded in each <br />analysis are defined in Table G.1-2 of the approved permit. <br />An extensive analysis of monitoring results Will be done <br />annually. Less extensive analyses will be p~rformed more <br />frequently. The monitoring program will be,re-evaluated <br />annually to ensure that the monitoring programland sampling <br />frequency are adequate. <br />Monitoring wells located in the vicinity off the tailings <br />disposal area will be monitored on a monthly basis for both <br />water levels and water quality. <br />2:1.2 Surface Water <br />__ Surface water-_mdhitoring~locations'are sh wn on figure <br />_T G-1 of the amendment application. There are six Surface water <br />monitoring locations for the San Luis Projecti Two of the <br />surface water monitoring site have not measured, any flow in <br />the approximately two years that they have been ~n place. The <br />surface water monitoring frequency is presented ~n Table G.1- <br />3 of the approved permit. <br />Flow at the surface water monitoring locations is measured <br />daily during spring runoff and weekly during base flov~ conditions. <br />Water quality samples are collected monthly d~ring runoff <br />conditions and quarterly the rest of the year. The water is sent to <br />
The URL can be used to link to this page
Your browser does not support the video tag.