Laserfiche WebLink
established in the pit area. ~~1ost or these wells will be <br />mined out during the life of the project. Tjhe monitoring <br />frequency is presented on Table G.1-3 of the approved permit. <br />The water levels in monitor wells will be measured on~ <br />a quarterly schedule. <br />Samples of groundwater will also ~be ollected for ' <br />laboratory analysis quarterly. The parameters in luded in each <br />analysis are defined in Table G.1-2 of the approved permit. <br />An extensive analysis of monitoring results Will be done <br />annually. Less extensive analyses will be p~rformed more <br />frequently. The monitoring program will be,re-evaluated <br />annually to ensure that the monitoring programland sampling <br />frequency are adequate. <br />Monitoring wells located in the vicinity off the tailings <br />disposal area will be monitored on a monthly basis for both <br />water levels and water quality. <br />2:1.2 Surface Water <br />__ Surface water-_mdhitoring~locations'are sh wn on figure <br />_T G-1 of the amendment application. There are six Surface water <br />monitoring locations for the San Luis Projecti Two of the <br />surface water monitoring site have not measured, any flow in <br />the approximately two years that they have been ~n place. The <br />surface water monitoring frequency is presented ~n Table G.1- <br />3 of the approved permit. <br />Flow at the surface water monitoring locations is measured <br />daily during spring runoff and weekly during base flov~ conditions. <br />Water quality samples are collected monthly d~ring runoff <br />conditions and quarterly the rest of the year. The water is sent to <br />