My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28729
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:56 PM
Creation date
11/21/2007 12:02:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Name
MONITORING REQUIRMENTS SUMMARY SAN LUIS PROJECT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A photographic r=cord of embankment and disposal are development <br />will be started before deposition, and will be continued at regular <br />intervals during the life of the facility. <br />-2-:0 Monitoring Plan '. <br />The monitoring plan may be divided into six basic aheas; initial <br />tailings construction monitoring, monitoring of the disposal area and <br />embankment, monitoring of elements which affect the mass andlwater balance <br />of the disposal area, monitoring of the hydrologic system atG the San Luis <br />Project, monitoring of pit inflows and monitoring in response to a spill. <br />1 <br />~2.1 Initial Construction Monitoring, <br />After construction of the Phase I embankment,i a series of <br />monitoring instruments will be installed in the embankment crest. <br />These instruments are designed to provide data on tMe performance <br />of the embankment after the embankment is const}~ucted. The <br />monitoring system consists of surface settlement sensors and <br />piezometers placed at selected locations. The piezom~ters would be <br />located so as to detect the development of phreatic had within the <br />drainage blanket and embankment fill. The settlement sensors will <br />provide data on the vertical surface displacements of he embankment <br />and give some indication of its 'en-masse' consolidation <br />characteristics. <br />Post installation baseline data from the instruments will be <br />obtained prior to operation of the facilities. Afteif commencement <br />of operation, readings of all instruments will be taken once each <br />month until trends are established. At that point Bt~R will submit <br />a technical revision to the MLRD showing the established trends and <br />requesting a reduction in the frequency of readings. A77 results <br />will be recorded and plotted. Additional readings swill be taken <br />whenever the rate or method of operation is modified, <br />
The URL can be used to link to this page
Your browser does not support the video tag.