My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE28729
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE28729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:35:56 PM
Creation date
11/21/2007 12:02:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Name
MONITORING REQUIRMENTS SUMMARY SAN LUIS PROJECT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />:~ `. ,, y _ . iii iiiiii iniiiiii <br />9 9 <br />M_O_NI_TO_RING REQUIREMENT SUMMARY <br />SAN LUIS PROJECT <br />/(_ ~~ /G <br />I.0 General <br />Monitoring and observation programs will be conducted tb confirm that <br />the performance of the San Luis Project is satisfactory, to r$fine analyses <br />and modify designs, and to document the performance fpr review by <br />regulatory agencies. The level and quality of groundwater, pit inflows, <br />and quality of surface water, the level of the phreatic surface in the <br />tailings embankment, the settlement of embankment, freewater~pond volumes, <br />and the embankment and disposal area levels will be monitored and recorded <br />systematically. Almost continuous visual observations oIf the mining <br />project will be conducted by the operating personnel. Significant <br />observations will be recorded. <br />The development of the monitoring program detains, such as <br />observation well locations, sampling type and sampling f~hequency, and <br />possible piezometer locations will be an evolutionary process continuing <br />throughout construction and operation of the project. <br />For this reason, the observation program and monitoring plans <br />outlined herein should be viewed as subject to change during tie operations <br />as necessary to ensure comprehensive site monitoring. <br />During operation, visual observations will be made of the tailings <br />disposal facilities on a daily basis to check the condition o.f the <br />embankment, disposal area, pipelines, and water control facilities. <br />Prior to tailings deposition, an operator's manual will be written <br />which will explain the general design criteria and what to look for during <br />operation. The operator's manual will contain standard forms for recording <br />and reporting observations from visual inspections and data obtained from <br />monitoring systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.