My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-12_REVISION - M1981148
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981148
>
2003-12-12_REVISION - M1981148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:47 PM
Creation date
11/21/2007 11:58:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981148
IBM Index Class Name
Revision
Doc Date
12/12/2003
Doc Name
Submittal
From
Robinson Brick Company
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Fugitive dust is expected from only one source -truck traffic along the haul roads. <br />Experience indicates the mining operations in the pits themselves generate little, if any, <br />dust. Water will be sprayed onto the roads to control dust, as needed, and relatively slow <br />haul truck speed limits enforced. <br />Mining Timetable. The uncertainty of current economic conditions in the construction <br />industry precludes accurate forecasts of mining activity over the life of the mine. <br />Therefore, the operator has elected to estimate a mining timetable based on an average <br />year and expects a specific year to vary widely from the average. <br />MINING TIMETABLE <br />Stage Years Total Acres +/- Mined Acres +/- <br />1 See Note 1 22.80 14.32 <br />2 55-60 47.30 44.53 <br />3 See Note 1 10.18 8.40 <br />4 40-45 15.52 11.95 <br />5 45-50 21.99 20.89 <br />6 15-20 8.13 7.44 <br />7 35-40 5.59 0 <br />TOTALS 131.51 107.53 <br />Note I: Clay mining operations are completed in these stages. <br />12 Revised: Dec. 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.