Laserfiche WebLink
RECLAMATION TIMETABLE <br />Estimated Acres +/- <br />Phase Years Slope Floor Reveeetation <br />Total <br />1 See Note 1 18.42 4.38 22.80 22.80 <br />2 55-60 30.32 16.98 47.30 47.30 <br />3 See Note 1 1.81 8.37 10.18 10.18 <br />4 45-50 6.25 9.27 15.52 15.52 <br />5 50-55 13.02 8.97 21.99 21.99 <br />6 20-25 6.13 2.00 8.13 8.13 <br />7 40-45 4.90 0.69 5.59 5.59 <br />TOTALS 80.85 50.66 131.51 131.51 <br />Note 1: Reclamation is completed in these stages. <br />Some reclamation periods will overlap and be in progress at the same time as <br />others, allowing for initially mining and reclaiming one-half of the phase and then <br />subsequently mining and reclaiming the remaining portion of the phase. <br />24 Revised: Dec. 2003 <br />