My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-24_REVISION - M1978268 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978268
>
2003-03-24_REVISION - M1978268 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:23 PM
Creation date
11/21/2007 11:55:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978268
IBM Index Class Name
Revision
Doc Date
3/24/2003
Doc Name
Amendment Application
From
Ouray County
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No explosives 1 -q will be used in conjunction with the mining nor reclamation operations. <br />FACILITIES <br />County Road 10-B, an existing ali-weather 18-foot wide 0,89 mile long restricted-use access road, provides <br />access from (Owl Creek) County Road 10 to both an electrical substation and the proposed extraction site. <br />No associated drainage structures other than the above-described water retainment pond aze required. The <br />extraction shall be from an open pit. No buildings, adits, vents, storage sheds, fuels storage, nor equipment <br />maintenance/shop facilities shall be located at the site. Product crushing and screening shall occur on the <br />site. Previously mined and worked-out portions of the extraction-affected areas shall be used for material <br />processing and stockpiling operations. Products shall be truck-hauled from the site to nearby vicinity <br />construction sites via the existing access road and County Roads 10-B ~ 10. <br />The open pit extraction azea shall cover approximately 24Ye, excluding the relocated forest access <br />road, and having varying depths of gravel extraction, dependent upon the relatively steep natural slopes of <br />the site. <br />Processing water shall not be required in the operations. Approximately 10,000 to 15,000 gallons a <br />day shall be required for haul road sprinkling for dust abatement and maintenance grading during product <br />hauling operations on the access road. <br /> <br />Flle: E \ OurayCO 1 DailaA3rav 1772AmenOApp1 19 <br />0?/27i03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.