bench, shall be delayed until completion of all the remaining Stage 4 extraction and removal of <br />equipment and products. Reclamation rip-loosening and topsoiling of the finished pit floor area <br />shall be delayed until completion of all mining stages (through the fifth bench of Stage 4), in order <br />to utilize the flat space for processing and stockpiling operations and for continued mining to the <br />final base elevation of 7,280 feet M.S.L. <br />TIMEFRAME s...-I.u <br />Mining is expected to resume upon approval of the Ouray County Conditional Use Permit, expected <br />sometime in the early spring of the yeaz, 2003. Extraction is expected to continue intermittantly, and active <br />operatons may be less than 180 days per year, depending upon azea demand for County construction <br />projects material. B.L.M. seasonal requirements restrict operations from November through May each year <br />for wildlife habitat protection. Phased extraction and gravel aggregate production is expected to occur <br />according to the following ... <br />OPERATIONS TIMETABLE. <br />EXTRACTION <br />UNIT CLEAR & STRIP <br />(or Relocate Stockpile) EXTRACTION <br />OPERATIONS SLOPES: T/S 8 VEG <br />RECLAMATION PARTIAL PERMIT <br />RELEASE <br />Stage 1 June '03 to July '03 to Oct `OS <br />Se t'OS to Nov OS <br />Au `06 <br />Stage 2 Sept `OS July '06 to Oct `07 <br />Set `07 to Nov `07 <br />Au `08 <br />Stage 3 June '08 July '08 to Oct `11 Sept ' 11 to Nov `11 Aug `12 <br />Sta e 4 --1~` Bench June ' 12 to Nov `15 <br />2 Bench June ' 16 to Nov 19 <br />3'd Bench June '20 to Nov `22 <br />4 Bench June '23 to Nov `25 - . , . "" ' <br />5 Beneh `~ June '26 to Oct `27 ~~ ~~ <br />.~ <br />Pit Floor Recl. <br />Sta es 2, 3, & 4 Sep 2027 to Nov `21 Total Release <br />2022 <br />Depletion of the resource is expected to take 19 to 20 years, depending upon demand for County public <br />roads construction and maintenance. The mine shall be closed and the site reclaimed upon total depletion of <br />the gravel resources within the designated extraction area of the permit. <br />GRAVEL RESOURCES ir_rel <br />The gravel resource to be mined is composed of rounded river-deposited alluvial sand and gravels. Beds or <br />lenses of lean clays aze found randomly layered within the river-deposited sand & gavel deposits. Prior <br />mining excavations in the massive gravel deposit have shown recoverable depths i ... ~ lai of gravel resoures <br />from the ridge top at elevation 7760 feet M.S.L. tiA well below the lower site elevations of azound 7300 feet. <br />Total depth of the alluvial gravel deposits have not been determined below those previously mined to <br />approximately 30 to 40-foot vertical depths on the sloping flank of the ridge. Continued mining shall be to <br />the designed footprint for a flat bench encircled by benched sideslopes up the flank of the ridge. The <br />underlying material is weathered . _.r m 1 shale of the Morrison formation, albeit at some unknown depth <br />below the lowest level of planned extraction operations. Sand and gravel resources r..9t are to be mined and <br />processed to produce rock aggregate for construction materials. No secondary nor incidental products i.. ~1 <br />are anticipated, except that recovered clay lens materials have been determined from tested soil samples to <br />be suitable and shall be utilized as plant growth medium for reclamation re-vegetation. <br />No refuse, nor acid, nor toxic producing materials aze involved in the proposed operations. <br />File: E 1 OurayCo 1 DaOasGrav 1112AmentlAppl 18 <br />0727N3 <br />