Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task # : 112 State :Colorado <br />Date : 10/16/2007 County :San Miguel <br />User : RCO S+te :Topaz Mrne <br />PermiUjob # : M-1980-055HR <br />Abbreviation :none <br />Filename :MSHR-112 <br />Permit or other job action :Conversion CN-1 <br />Task description :Haul topsoil to be spread on disturbed areas <br />HOURLY EQUIPMENT COST <br />team -Truck :Cat 730 <br />lift <br />equipment -Load area <br />-Dump area <br />tenants -Motor grader <br />-Water truck <br />Shift basis : 1 per day <br />Cost Breakdown : 7ruck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename: truck2 loader NA NA NA NA <br />Utilization-machine : 79 100 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $39.59 $21.07 NA NA NA NA <br />Operating cosUhour: $41.66 $30.76 NA NA NA NA <br />Ripper op. cost hour : NA NA NA NA NA NA <br />Operator cost/hour: $21.72 $32.78 NA NA NA~ NA <br />Unit subtotals : $102.96 $84.61 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $290.54 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour: $290.54 <br />MATERIALQUANTITIES <br />Initial Swell Loose <br />volume: 2,904 LCY factor: NA volume: 2.904 LCY <br />Source of quantity take-off :applicatrbn (9"depth x 2.4 acres) <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck CaoaciN <br />Truck Payload (weight) Basis <br />Material weight <br />Descr.: Earth - Drv Hacked <br />Rated payload <br />Payload capacity <br />Truck Bed <br />2,550 pounds/LCY Struck volume : 17.10 LCY <br /> Heaped volume : 22.10 LCY <br />60,000 pounds Average volume : 19.60 LCY <br />23.53 LCY Adjusted volume': 22.10 LCY <br />Final [ruck volume based on number of loader passes : 20.82 LCY <br />'truck volume adjustetl to not exce etl ratetl payloatl or heapetl volume <br />Loading Tool CabaciN : Joh Condition Corrections : Site altitude (ft.) <br />Ratetl capacity (nom. heaped) : 3.750 LCY Truck Loader <br />Descr.:Other-rock/dirt mixtures (100-120%J Altitude adj.: 1.000 1.000 <br />Bucket fill factor : 1.100 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity : 4.125 LCY Net correction : 0.830 0.830 <br />sheet 1 of 2 <br />