My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-16_REVISION - M1980055HR
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980055
>
2007-10-16_REVISION - M1980055HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:02 PM
Creation date
11/21/2007 11:47:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980055HR
IBM Index Class Name
Revision
Doc Date
10/16/2007
Doc Name
Cost summary form
From
DRMS
To
Topaz Mine
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 111 <br />Date : 10/16/2007 <br />User : RCO <br />Agency or organization name :DRMS <br />Permit or other job action :Conversion CN-1 <br />Task description :Rip compaction on additional 2.4 acres of waste <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />State :Colorado PermiUjob # :M-1980-055HR <br />County :San Miguel Abbreviation :none <br />Site :Topaz Mine Filename : MSHR-111 <br />Basic machine :Cat D7R DS Sedes 11 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Atfachmenf no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.40 acres Rip depth (ft) : 1.00 Volume : 3,872 BCY or CCY <br /> <br />Source of estimated quantity :application <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted producfion : NA cu. yds./hour per selected method : 1,184.27 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 7,000 feet <br />Average ripping width : 6.50 feeUpass Altitude atljustmeni : 1.00 (Cat H8) <br />Average ripping length : 300.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.734 acres/hour Adjusted unit production : 982.94 cu. yds./hour <br />Unadjusted production : 1,184.27 cu. yds./hour Adjusted fleet production : 982.94 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 3.94 houfs <br />Unit cost : $0.114 per cu. yd. Total jab cost : $443 <br />
The URL can be used to link to this page
Your browser does not support the video tag.