My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-31_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2007-01-31_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:24 PM
Creation date
11/21/2007 11:35:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Revision
Doc Date
1/31/2007
Doc Name
112c application
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 4: Overburden Stripping and Storage <br />Requirement: Overburden will be removed from each area as it is opened for mining <br />rather than over the entire area all a[ once. (No discussion associated with this requirement) <br />Requirement: Overburden removed from lands mined shall be used to construct the barrier <br />berms of sediment basins in Phase 1 as well as final blending with wash fines to complete <br />backfilling. (See Page 27) <br />Requirement: The arrangement of berms and sediment basins in Phase 1 will be done such <br />that all basins have at least one side connected to adjacent undisturbed land, and <br />groundwater can continue to flow through Phase 1 to lands to the east of the operation. The <br />actual arrangement shall be at the discretion of the operator so long as the connection and <br />flow-through requirements are me[. The arrangement shown on Exhibit C-4A is a possible <br />arrangement that would meet the requirements. Other configurations are possible [hat <br />would meet [he requirements. (See Page 28 -The discussion for this item contains important <br />information regarding this requirement) <br />Requirement: I[ is expected that [he overburden in the plant site will not be removed at the <br />end of the operation, but if additional fill is needed the plant site can provide an additional <br />source for a large amount of fill to complete backfilling. (See Page 29) <br />STEP 5: Mining Phase 2 and Linkages to Phase 1 <br />Requirement: All mining in Phase 1 and Phase 2 will be done from dewatered pits. <br />(See Page 30) <br />Requirement: Mining by any method other than [he dewatered pit method described in <br />this plan will require a permit modification prior to changing the method of mining. <br />(See Page 30) <br />Requirement: Aggregates will be removed from [he deposit by front-end loader and will be <br />transported directly to the processing plan[ via conveyor. No specific conveyor routes are <br />shown on the mining plan map because these will frequently change as the deposit is mined. <br />(see Page 3!) <br />Pueblo East Pit Amendment 3 (2007) Exhibit D Page 6 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.