Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 001 State :Colorado PermiUjob # : M-1986-033 <br />Date : 05/05/2006 County :!a Plata Abbreviation :none <br />User : KAP Site :Hess Pit Filename : M033-001 <br /> Operating cosUhour: $36.J5 ~ $37.62 $41.10 <br /> OperatorcosUhour: $27.40 $27.40 $27.40 <br /> HelpercosUhour:l $0.00 $25.15 $25.15 <br /> Total Unit CosUhour : $88.91 $118.29 ~ $128.18 <br /> <br />~ ~., <br />NON•ROADABlE EOUIPMENT <br />Machine WeighUunit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permil <br />Description (ions) CosUhrlunit CosUhr/unit (No. units) Cost/hr/fleet CosUhr/fleet CosUfleet <br />-Cat D8R Series 11- 8SU 52.55 $53.92 $128.1 B 1 ~ $182.10 $128.18 $0.00 <br />-Cat 627G w/push-pull 42.04 $49.73 $118.29 2 ~ $336.04 $236.58 $0.00 <br />sheet 1 of 2 <br />Subtotals :I $518.1d I $364.76 I $0.00 <br />