Laserfiche WebLink
Sheet 2 of 2 <br /> Nearest major city or town within project area region : Durango <br />Transportation Cvcle Time : Non- Total one-way travel distance : 73.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.43 0.43 Total non-roadable mob/demob cost `: $1,801.46 <br />Return time (hours) = 0.43 0,43 ' nvo ro~na tops with haul rig <br />Loading time (hours) = 0.50 NA Total roatlable mob/demob cost": $8766 <br />Unloading time (hours) = 0.50 NA ^ one round vip, no haul rig <br />Subtotals = i.87 0.87 <br />JOB TIME AND COST Total job time : 3.73 <br />Total iob cost : $1.88 <br />EQUIPMENT HAUL DISTANCE and TIME <br />