My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-11_REVISION - M1986033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986033
>
2006-07-11_REVISION - M1986033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:41 AM
Creation date
11/21/2007 11:31:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986033
IBM Index Class Name
Revision
Doc Date
7/11/2006
Doc Name
Surety Increase
From
DMG
To
Sunnyside Gravel
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Date: 05-May-2006 ~~ Permit or jobno.: M-1988.033 t/ Site :Hess Pi! <br />User: 1CAP / Abbreviation: none State :Colors do <br />Filename : M033-000 County :La Plata <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit orjob action :Bond Recalculation re/aled to Inspection t/ <br />IAJR LWt lulrcecf ew rs) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />OD7 -Mobilize/Jemobilize ~ mobilize 1 3.7 $1,889 <br />002 -GradeHi;Thwalls dozer 1 6.8 $1,125 <br />003 -Spread Topsoil scraped 2 4.54 ; $2 361 <br />004 -Debris removal demolish 7 3. $645 <br />inGUOes intlat:on factor adjustment of ~. NA <br />INDIRECT COSTS <br />SUBTOTALS'. 20.82 $8,229 <br />TOTAL DIRECT COST - $8,229 <br />ovERNEAD ANO PROFIT- Liability insurance : 2.02 % of direct total = $166 <br />Performance bond : 7.05 % of direct total = $86 <br />Job superintendent : 10.31 hrs'...$/hr: $39.38 total = $406 <br />Profit : 70.00 % of direct total = $823 <br />'assume nel hours=50%ol task hours TOTALO&P= $1,482 <br />LEGAL•ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (direU.O&P)= $9,711 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contract bid preparation : 4.25 % of cntr. NA total = $413 <br />Rectarnation management andJor administration : 5.00 % ofcntr. NA total = $466 <br />CONTINGE~CV - NA' NA total = NA <br />'contirgencius accounted twat task level TOTAL INDIRECT COST= $2,380 <br /> TOTAL BOND AMOUNT (direct +indireet) _ $10,609 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.