Laserfiche WebLink
Agency or organization name :DRMS <br />Permit or other job action :CN-Ot <br />Task description : Bac~ll 8 Grade to 3h:1 v <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />OperatingcosUhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosUhour : x204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 37,222 LCY factor : NA volume : 37,222 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors :.; ,; <br />Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 4, 050 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : f.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.11 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Met correction : O.dB <br />Adjusted unit production <br />Adjusted Fleet production <br />(Cat <br />438.80 LCY/hr <br />438.80 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 84.83 Hours <br />Unit cost : $0.466 ILCY Total job cost : x17,350 <br />