My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-18_REVISION - M1998071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998071
>
2007-06-18_REVISION - M1998071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:02 PM
Creation date
11/21/2007 11:30:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998071
IBM Index Class Name
Revision
Doc Date
6/18/2007
Doc Name
Conversion Approval
From
DRMS
To
Richard Fryrear
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinsl Software <br />BULLDOZER WORK <br />,.. <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado PermiUjob# :M-1998-071 <br />Date: 06/1&2007 County:Yuma Abbreviation <br />User : ESC Site :FryrearGravel Pit Filename <br />Agency or organization name : DRMS <br />Permit or other job action : CN-01 <br />none <br />M071-002 <br />Task description :Replace Topsoil <br />;_ ;;: , <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Shift basis : 1 per day <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op.cost/hour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cost/hour : $204.53 Total fleet cosUhour : x204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,306 LCY factor : NA volume : 9,306 LCY <br />Souroe of estimated volume :Operator Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 0.00 <br />Average site altitude : 3,950 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />Earth -Loam <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : f.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.10 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Adjusted unit production : 381.66 LCY/hr <br />Adjusted fleet production : 381.88 LCY/hr <br />Total job time : 24.38 Hours <br />Unit cost : $0.536 /LCY Total job cost : x4,987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.