My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-18_REVISION - M1998071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998071
>
2007-06-18_REVISION - M1998071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:02 PM
Creation date
11/21/2007 11:30:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998071
IBM Index Class Name
Revision
Doc Date
6/18/2007
Doc Name
Conversion Approval
From
DRMS
To
Richard Fryrear
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 18-Jun-2007 Permit or job no.: M-1998-071 Site : Fryrear Gravel Pit <br />User : ESC Abbreviation : none State :Colorado <br />Filename ; M071-000 County :Yuma <br />Agency or organization name : DRMS <br />Permit or job action : CN-Ol <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED S)ZE HOURS COST <br />001 -8ac~ll and Grade fo 3h:1 v Slopes dozer 1 84.8 $17,350 <br />002 -Replace Topsoil scraped 1 24.3 $4,987 <br />003 -Revegetate Affected Area revege 1 40.0 $14,092 <br />004 -Mobilization/Demobilization mobilize 1 5.0 $2,775 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suerorALS: 154.3 $39,204 <br />' includes intlalion factor adjustment of : NA % TOTAL DIRECT COST • 539.204 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT • Liability InSUranCe : 2.02 % of direct total = $792 <br />Performance bond : 1.05 % of direct total = $412 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $3,920 <br />'not required (or eqp. operator serves as super.) TOTAL O 8 P = $5,124 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $44,328 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $2,216 <br />CONTINGENCY- NA' NA total= NA <br />' contingencies accounfM for at (ask level TOTAL INDIRECT COST = $7,840 <br />TOTAL BOND AMOUNT (direct + Indirect) = 547,044 <br />
The URL can be used to link to this page
Your browser does not support the video tag.