My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-08-23_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2002-08-23_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 11:23:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
8/23/2002
Doc Name
Replacement Pages
From
Environment Inc
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN (CONT) <br />rmmn® AetuL 2001 <br />ExNlerr D <br />hillside as mining moved into the northwest corner. The elevation <br />of this area will not be mined to its final level initially, but <br />rather will be mined to the level of the adjoining floor and later <br />lowered to its final elevation as mining progress. <br />Once the face is removed mining would then begin to the <br />northwest towards the northwest corner of the mine and the north- <br />south face could then be gradually oriented so it is less visible <br />from the south. In this area the mine walls will be like what is <br />permitted at this time. in the two areas where vertical benches <br />will be left, the overall bench slopes (horizontal to vertical) may <br />vary between Oh:ly and l.lh:ly. The Pre-Miaing Plan Map - Map <br />ExLibit C shows what the existing natural slopes are, about 0.8h:1v <br />in certain places along the south end of the property, and approxi- <br />mately how the site looks at this time. <br />From the digline to the top of the reservoir the benches will <br />be created in an irregular pattern to breakup the straight line <br />regularity normally associated with a quarry. A level area approx- <br />imately 40 feet wide will be left around the reservoir and the <br />slopes into the bottom will be mined 3h to Sv. This area is in the <br />building envelope area and would be graded and shaped until devel- <br />oped. <br />Mining would then progress to the east thru the new area. <br />Along this north side mining will change. The plan is to create a <br />series of uniform benches. They will be higher and longer with <br />trenches excavated on the flat surfaces to facilitate reclamation. <br />it is anticipated that large amounts of finer material that has no <br />market will be available as the mine progresses and this will <br />provide a place to dispose of it. To do this the south facing <br />slope will be mined using 60' high by 180' wide benches that will <br />be Backfilled with the overburden and fines created during process- <br />ing. The trench to be mined on the benches will act as a "key" to <br />lock the compacted fill so it creates a stable <br />5 (Revised 8/19/02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.