My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26446
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:23 PM
Creation date
11/21/2007 11:19:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
6/7/1990
Doc Name
UPDATE ON SNYDER CORRECTIVE ACTION PLAN STATUS YOUR FN M-77-210
From
MARK A HEIFNER
To
MLR
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />June 7, 1990 <br />Snyder Correction Actions <br />Bruce Humphries <br />Work yet to be done: <br />1. Disturbance Areas #2 and #3 must be graded <br />according to the plan. See description of problems. <br />2. Silt fences need to be installed on Disturbance <br />Area #1. <br />3. HR-6 needs to be installed. <br />Q. Trees must be planted in Williams Canyon and on t•he <br />roadside disturbance areas. <br />5. The sediment basin must be constructed. <br />Problems encountered during the implementation: <br />1. Disturbance Areas #2 and 1f3 are being examined from <br />the standpoint of solving the logistical problems of <br />removing the material. The method used on area #4 cannot be <br />used here as the slopes are too steep to construct any kind <br />of bench from which equipment could work. The method used <br />on Area //1 cannot be used because removal is needed rather <br />than just reshaping. Now that the thunderstorm season is <br />upon us it is our opinion that it would be inadvisable tc do <br />any work in regrading roadside disturbances #2 and #3 as <br />there would be little opportunity to control erosion by the <br />time the work is completed. Therefore, regrading of areas <br />#2 and #3 will be delayed until autumn and revegetation <br />implemented at that time. <br />2. Disturbance Area /{!, needs to have the grades <br />adjusted. In order to remove the material a bench needed to <br />be constructed out of the fill material. This resulted in <br />the production of a longitudinal shape that is somewhat <br />different from that intended. To correct the problem a <br />large dozer must be acquired that has a cable and winch <br />attached. This will allow the use of a small dozer to <br />finish grading the slope while the large dozer, parked on <br />the roadway, holds the small dozer on the elope and helps it <br />to move up and down the steep slopes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.