My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE26446
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE26446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:34:23 PM
Creation date
11/21/2007 11:19:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
6/7/1990
Doc Name
UPDATE ON SNYDER CORRECTIVE ACTION PLAN STATUS YOUR FN M-77-210
From
MARK A HEIFNER
To
MLR
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ~Ila~k ,i ;~e~C <br />37 E. Colorado Avenue <br />Denver, CO 80210 <br />(303) 722-9067 <br />Environmental Services Botanical Studies • <br />June 7, 1990 <br />Bruce Humphries <br />Mined Land Reclamation <br />215 Centennial Bldg. <br />1313 Sherman St <br />Denver, CO 80203 <br />RE: Update on Snyder Corrective Action Plan statue. <br />Your file no.: M-77-210 <br />Dear Mr. Humphries: <br /> <br />_~uri ~ ~:~~~ ~~ <br />iJ1iNE©LANt) <br />SEC'+_ AMATI(')Al tll~+~:,: ~ ~ i <br />This letter is to inform you of the status of the work done <br />to complete the Corrective Action Plan for the Snyder <br />Quarry, operated by Castle Concrete Company. This letter <br />will describe what has been done and what yet needs to bc~ <br />done and the various problems we have encountered in <br />implementing the plan. <br />Work performed to date includes: <br />1. All disturbance areas except #2 and #3 have beers <br />completely regraded, topsoiled, and seeded. <br />2. Disturbance Area #4 has been regraded but needs some <br />additional work to bring the slope gradients more in line <br />with the design. This will be completed either in the near <br />future or after the thunderstorm season is over. See <br />description of problems encountered. <br />3. All culverts, except for HR-6 have been installed. <br />Q. Many roadside areas with steep slopes on the inside <br />of the road have been backfilled. These will be graded and <br />seeded in the coming fall season. <br />5. The location and layout for the sediment basin has <br />begun and will be constructed soon. <br />~ III IIIIIIIIIIIII III <br />Photography ~ - <br />6. All areas in Williams Canyon have been seeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.