Laserfiche WebLink
<br /> <br />Reclamation of Area 2 will begin when Area 1 reclamation is completed. Area 2 <br />reclamation will proceed easterly from Area 1, along the south side of Area 2, where <br />mining operations will be about 800 feet wide. Topsoil and overburden stripped from <br />continuing Area 2 mining operations, east and north of initial Area 2 reclamation, will be <br />hauled to the Area 2 reclamation work site by scrapers, and placed and spread on the pit <br />floor to a minimum depth of two feet. Stockpiles will not be used. <br />Overburden stripped from the north part of Area 2 and Area 3 will be placed on or <br />neaz the lazge overburden stockpile in the northeast part f the original permit area. When <br />mining Area 3 is completed, a minimum oftwo feet of stockpiled overburden and topsoil <br />will be placed and spread over Area 3 by scrapers. <br />The only buffer azea affected will be the berm placed north of the Sanchez parcel <br />During reclamation, the berm material will be removed for nearby reclamation use and the <br />disturbed area will be graded to the same elevation as the surrounding land and seeded <br />with the approved seed mix. The farmer may place an access road along the buffer zone <br />in this area when reclamation is complete. <br />Exhibit F -Reclamation Mau. <br />Acreage figures on the Reclamation map will be revised to 52.43 acres. <br />As described previously, L. O. Griffith, the landowner adjacent on the west, will <br />mine his property up to the common property line at the same elevation and slope as the <br />reclaimed permit area. <br />The northwest area of the existing permit should contain no reclaimed contours <br />below the elevation of approximately 4655 feet because the contours at that elevation are <br />over the river bluff (below the level of the pit floor) and will not be disturbed. <br />On the Reclamation Map the north end of the haul road is dashed to show the <br />approximate location the road will enter the pit. The access road leading to the pit floor <br />will not terminate. The farmer will determined the location of the farming roads and river <br />access road after reclamation. <br />The ephemeral drainage channel will be graded flat and farmed. As mining <br />proceeds, ephemeral flows from the drainage area will be piped across the mined area. <br />After mining, a permanent pipeline will remain. <br />Exhibit H -Wildlife Information. <br />The two gullies referred to by the CDOW officer on the county Agency Review <br />Sheet are within the original permitted area. During his site inspection, the officer <br />apparently was looking at the entire site as one project area and didn't realize the gullies <br />were not within the proposed expansion azea. <br />