My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />American Tunnel Bulkhead Costa <br />Page 2 <br />(_. <br />12° C18ss 600 gate v82Ve Lump Sum $24411 <br />i° schedule 80 316E SS piping <br />w/collars, valves, fittings, <br />pressure gauges Lump Sum $1208 <br />Extension piping above and below <br />bulkhead Lump Sum $2605 <br />Ready Mix concrete - 6 i/2 yards Lump Sus $ 835 <br />Non-shrink grout (50@ bags) @ $10.16 2 $ 20 <br />PVC screen ~ bolts Lump Sus $ 634 <br />16~ Sons tube & bulkhead dri-mix <br />for pipe supports - 40 bags Lump Sum $ 203 <br />Sandblaster sand /30 grit <br />(100 bags) @ $7.63 20 S 153 <br /> SubTotal y`10,587 <br />INSTALL VENTILATION: <br />EQUIPMENT: <br />Locomotive (in Misc Costs) <br />40 HP fans @ $3500 purchase 2 $7000 <br />CONTRACT LABOR: $7184 <br />MATERIALS: <br />Vent Bag 543799 <br />SubTotal $57983 <br />PLACE LIMESTONE BETWEEN BIJLKfIEAD 6 COFFER DAM: (5 men - 2 days) <br />EQUIPMENT: <br />Locomotive (in Misc Costs) <br />1 1/4 LHD @ $35/hr 20 $ 700 <br />DIRECT LAHOR @ $16.39/hr 100 $1639 <br />BENEFITS @ 35$ of wages $ 574 <br />INDIRECT LABOR (outside man) @ $16.39 20 hrs $ 328 <br />BENEFITS @ 35$ of wages $ 115 <br />MATERIALS <br />Limestone (58000 lbs) $1633 <br />Lime (15000 lbs) S1100 <br />SubTotal $6089 <br />BUILD FORMS, INSTALL REBAR, BRACE FORMS: <br />EQUIPMENT: <br />Locomotive (in Misc Coats) <br />Misc. Tools (in Misc Costs) <br />Welder & torch @ $100/day <br />GD 83 Jackleq (in Misc Costs) <br />(5 men - 12 days; 1 man - 3 days) <br />3 days $ 300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.