My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />AMffi2ICAN TUNNEL BULREIE~-D casTs <br />INITIAL SITE CLEANING: (2 men - 6 days) <br />EQUIPMENT: <br />2 yd LHD @ $45/hr 120 hrs $5400 <br />DIRECT LABOR @ $16.39/hr 120 hrs $1967 <br />BENEFITS @ 353 of wages $ 688 <br />INDIRECT LAHOR (outside man) @ $16.39/hL' 60 hrs $ 983 <br />BENEFITS @ 353 of wages S 344 <br /> SubTotal $9382 <br />BUILD COFPER DAM, INSTALL PIPING, SET REBAR ANCHORS <br />AND FINE SITE CLEANING: (5 men - 12 days) <br />EQUIPMENT: <br />Misc hand tools (in Misc costs) <br />Bobcat loader & hydrau2lc hammer rent Lump Sum $1756 <br />M-20 Reed concrete pump ($39786 value) <br />$2000/mo; $800/wk 3 days $ 800 <br />Moran car (covered under pour <br />bulkhead section) <br />Concrete pipe and hose ($4211 value) <br />$350/mo; $150/wk 1 wk $ 150 <br />Locomotive (in Misc Costs) <br />GD 83 Jackleg (in Misc Costs) <br />Sandblaster ($1375 value) @ $20/day 3 days $ 60 <br />Demolition hammer rental Lump Sum $ 342 <br />DIRECT LABOR @ $16.39/hr 600 hrs $9834 <br />BENEFITS @ 353 of wages $3442 <br />INDIRECT LABOR (outside man) @ $16.39/hr 120 hrs $1967 <br />BENEFITS @ 353 of wages $ 688 <br />MATERIALS: <br />Plywood (3/4"x4'x8~) @ $21.59 10 $ 216 <br />2"x4"x12 @ $ 4.95 52 $ 257 <br />All thread (form ties) Lump Sum $ 155 <br />Stainless steel inlet trash box Lump Sum $ 958 <br />Stainless steel cable - pipe ties Lump Sum S 440 <br />12" schedule 80s 316E 53 piping <br />w/flanges, seep collars 6 <br />bolts Lump Sum $19453 <br />
The URL can be used to link to this page
Your browser does not support the video tag.