Laserfiche WebLink
c ~,. <br />Terry Tunnel Bulkhead Costa <br />Page 4 <br />MISC. COSTS <br />ENGINEERING DESIGN $4535 <br />ENGINEERING INSPECTION (Design Engineer) $2077 <br />MATERIALS T83TING $ 168 <br />MISC SMALL HAND TOOL USAGE Lump Sum $3000 <br />MISC MATERIALS (ie nail s, bits, wire, etc) Lump Sum $3000 <br />DIESEL Lump Sum $1500 <br />ELECTRICITY $5000/mo 3 mo $15000 <br />AT LOCOMOTIVE USAGE $6000/mo 3 mo $18000 <br />COMPRESSOR USAGE $3000/mo 3 mo $9000 <br />AIR-BEAN 25 Pump Usage $ 400/mo 3 mo $1200 <br />FLIGHT 13 HP Pump Usage $ 540/mo 3 IDo $1620 <br />GD 83 JACKLEG $ 375/mo 3 mo $1125 <br />OUTSIDE IAADER $6000/mo 3 mo $18000 <br />SAFETY SUPPLIES Lump Sum S1000 <br /> SubTotal $79225 <br />PLACE LIMESTONE AT HULI(HEAD AND SCREEN DRIFT TO KEEP DEBRIS FROM BULRfIEAD <br />PIPE iNTARE: (5 men - 5 days) <br />EQUIPMENT: <br />1 1/4 yd LHD @ $35/hr 50 hrs $1750 <br />Forklift @ $20/hr 50 hrs $1000 <br />DIRECT LABOR @ $16.39/hr 250 hrs $4098 <br />BENEFITS @ 35$ of wages $1434 <br />INDIRECT LABOR outside man S <br />hoistman @ $16.39/hr 100 hrs $1639 <br />BENEFITS @ 35$ of wages $ 574 <br />SUPPLIES: <br />Lime (8000 Ibs) $ 587 <br />Limestone (55000 lbs) $1549 <br />Screen Lump Sum S 200 <br />SubTotal $12831 <br />