Laserfiche WebLink
~ C <br />Terry Tunnel Bulkhead Costs <br />Page 3 <br />1 - concrete vibrator ($770 value) <br />@ $30/day 2 $ 60 <br />1 - 1 1/4 yd. LHD @ $35/hr 100 hrs $3500 <br />1 - Forklift @ $20/hr 100 hrs $2000 <br />Roller Conveyors($2605 value) <br />@ $250/mo 3 wks $ 250 <br />bIRECT LABOR @ $16.39/hr 890 hrs $14587 <br />HOURLY OVERTIME COSTS DURING POUR Lump Sum $1598 <br />SALARY COSTS DURING POUR Lump Sum $2183 <br />BENEFITS @ 35$ of wages $6429 <br />INDIRECT LABOR outside man 6 <br />hoistman @ $16.39/hr 200 hrs $3278 <br />BENEFITS @ 35$ of wages $1147 <br />CONTRACT LABOR for Pour $ 864 <br />MATERIALS: <br />Concrete Mix - 60 lb bags <br />3 truckloads @ 770 bags/truck <br />(42$ extra) Lump Sum $6679 <br />Delay Set Lump Sum $ 248 <br />Plasticizer Lump Sum $ 136 <br />Type V Portland Cement <br />(94 lb bags) @ $5.60/ea 50 $ 280 <br />Meals during pour Lump Sum S 345 <br /> SubTotal $46684 <br />STRIP FORMS, MOVE EQUIPMENT AND GROUT BULKHEAD: (3 men - 12 days) <br />EQUIPMENT: <br />GD 83 Jackleg (in Misc Costs) <br />Grout Mixer & Pump ($8500 value) <br />$700/mo; $250/wk 2 weeks $ 500 <br />1 1/4 yd LHD @ $35/HR 120 hrs $4200 <br />DIRECT LABOR @ $16.39/hr 360 hrs $5900 <br />BENEFITS @ 35$ of wages $2065 <br />INDIRECT LAHOR outside man & <br />hoietman @ $16.39/HI2 240 hrs $3934 <br />BENEFITS @ 35$ of wages $1377 <br />MATERIALS: <br />Packers @ $120.00 ea 4 $ 480 <br />Type V Portland Cement <br />(94 lb. bags) @ $5.60 ea 20 S 112 <br /> SubTotal $18568 <br />