Laserfiche WebLink
~. <br /> <br />Terry Tunnel Bulkhead Costs <br />Page Z <br />MATERIALS: <br />Timber: <br />8"x8"xlfi' S4S (1450+psi) @ 183.03 <br />2"x6"X14' 845 (1800+psi) @ $15.86 <br />2"X12"x14'848 (1000+psi) @ $18.75 <br />8" DRISCO pipe with flanges @ $8.39/ft <br />/10 Reber GR60 x 40' @ $66.31 <br />:6 Reber GR 60 x 40' @ $14.22 <br />Concrete Blocks (pipe support)@ $252 LS <br />6" Sch. 80 316E SS pipe x 11' with 300f <br />flange, 150,E flange and 3 seep rings <br />1" Sch. 80 316E 3S pipe (11'length) <br />w/ couplings, seep collars, fittings, <br />12 <br />24 <br />8 <br />50 <br />14 <br />9 <br />1 <br />$2196 <br />$ 381 <br />$ 150 <br />$ 420 <br />$ 928 <br />$ 128 <br />$ 252 <br />1 <br />valves and pressure gauge. 1 <br />6" 316E SS I{ITX Gate Valve - Class 300 1 <br />Misc bolt packages and gaskets 1 <br />Freight 1 <br />SubTotal <br />BRACE BULKHEAD: (3 men - 4 days; 1 welder - 2 days) <br />EQUIPMENT: <br />Welder and Torch @ $100/day 2 <br />GD 83 Jackleq (in Misc Costs) <br />DIRECT LABOR @ $16.39/hr 140 <br />BENEFITS @ 35$ of wages <br />INDIRECT LABOR outside man & <br />hoistman @ $16.39 80 <br />BENEFITS @ 358 of wages <br />MATERIALS: <br />Angle 5/16"x4^xfi" $4.23/LF 70' <br />/8 Threadbar GR 60 @ $1.36/LF 120 LF <br />/8 Bevel and Flat Washers @ $1.01/pair 70 <br />2" schedule 20 pipe @ $3.70/LF 40' <br />Celtite @ $27.04/case 3 <br />SubTotal <br />$2250 <br />$ 618 <br />$3986 <br />$ 155 <br />~ 200 <br />$26855 <br />$ 200 <br />$2295 <br />$ 803 <br />$1311 <br />$ 459 <br />$ 296 <br />$ 163 <br />$ 71 <br />$ 148 <br />$5827 <br />SET UP AND POUR BULKHEAD: (5 men-10 days; 13 men, 4 staff-2 days + overtime) <br />EQUIPMENT: <br />2 - 9 cu.ft.mixers($5822 value) @ $500/mo 3 wka $ 500 <br />1 - Auger feed ($2800 value) @ $250/mo 3 wks $ 250 <br />1 - M20 Reed Concrete Pump ($39,786 value) <br />@ $2000/mo 3 wka $2000 <br />w/ 150' - 4" concrete pipe and hose <br />($4211 value) @ $350/mo 3 wka $ 350 <br />