Laserfiche WebLink
~_ ~,~ <br />Terry Tunnel Bulkhead Costa <br />Page 5 <br />INSTALL VENTILATION: (2 men - 2 days Setup; Contractor - 8 days) <br />DIRECT LABOR @ $16.39/hr 40 hrs S 666 <br />BENEFITS @ 35$ of wages $ 229 <br />EQUIPMENT: <br />Generator - 125 RW @ 5400/wk 2 wka $ 800 <br />2 x 10 Fan @ $3000 purchase $3000 <br />Flatbed Truck and Loader @ $35/hr 20 hrs $ 700 <br />CONTRACTOR CHARGES to Install (Includes Equipment) $6400 <br />SUPPLIES: <br />Verit Baq 20" X 3a00~ S4755 <br />SubTotal $16550 <br />TOTAL TERRY TUNNEL BULKHEAD DIRECT COSTS $220,591 <br />