My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-15_REVISION - M1983141 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-15_REVISION - M1983141 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:23 PM
Creation date
11/21/2007 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/15/2006
Doc Name
Construction Costs for Hydraulic Bulkheads in Underground Mines
From
DMG
To
Mining and Environmental Services
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~_ ~,~ <br />Terry Tunnel Bulkhead Costa <br />Page 5 <br />INSTALL VENTILATION: (2 men - 2 days Setup; Contractor - 8 days) <br />DIRECT LABOR @ $16.39/hr 40 hrs S 666 <br />BENEFITS @ 35$ of wages $ 229 <br />EQUIPMENT: <br />Generator - 125 RW @ 5400/wk 2 wka $ 800 <br />2 x 10 Fan @ $3000 purchase $3000 <br />Flatbed Truck and Loader @ $35/hr 20 hrs $ 700 <br />CONTRACTOR CHARGES to Install (Includes Equipment) $6400 <br />SUPPLIES: <br />Verit Baq 20" X 3a00~ S4755 <br />SubTotal $16550 <br />TOTAL TERRY TUNNEL BULKHEAD DIRECT COSTS $220,591 <br />
The URL can be used to link to this page
Your browser does not support the video tag.