My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-02-26_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
1985-02-26_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 3:29:29 PM
Creation date
11/21/2007 11:06:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
2/26/1985
Doc Name
Letter about Army CORPS Permit
From
WYOMING FUEL CO
To
ARMY CORP OF ENGINEERS
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12055 W. Second Plae~ .• P.Q. Box 15596 • Lakewood. Colorado 80215 • Telephone (303)989-5037 <br />~. . <br />Y <br />3 <br />February 18, 1985 <br />Ms. Candace Thompson <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re; Design changes for Diversion of the Middle Fork of the Purgatoire River, Technicial <br />Revision to the New Elk Permit Revision No. 1, Submitted February, 1984 <br />Dear Ms. Thompson: <br />As per our telephone conversation of February 15, 1985, WFC will extend the <br />temporary diversion past pond 006. The temporary diversion will now reenter the <br />Purgatoire between ponds 006 and 007. We will attempt to control drainage from the <br />plant area to pond 006. The temporary sediment structure as originally proposed, will not <br />be built. Enclosed is revised Figure F-1 showing these changes. <br />WFC plans to have the New Elk Mine water discharge enter the temporary diversion. <br />Design for this will have to be done in the field. New Elk discharge will be repiped into <br />the channel after construction is complete. <br />Tn addition, WFC would like to proceed with the temporary diversion and berm <br />construction during the public notice. No water will be diverted until the public notice is <br />complete. <br />Sincerely, <br />David M. Stout . <br />Environmental Coordinator <br />Enclosure <br />DMS/cs <br />cc: Mike Kolin <br />Jack Snow <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.