Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />- _ b1~Caf~d~ccTt`iompso~- -~ - - ~ -- - ~ -: ~ - <br /> February` IT,_1983:: . <br />- <br /> 1'agr: Twac_ - <br /> <br />In regard to rip-rap, WFC wlll rip-rap the outside curves nearest to the plant <br />according to original design specifications, see Ftgure• F-1. On the outride curves nearest <br />to the highway, Type B rip~ap will be placed approximately 3 feet above the stream <br />bottom. WFC understands that.you will stipulate that the stream configuration be <br />monitored over time to determine whether or not more rip-rap will be required in the <br />future. If after S years, the slopes have remained stable, WFC may apply for partial or <br />total bond release. 1VFC.is proposing a bond amount of $54,338.00 for completion of rip- <br />rap to the originally approved design. Table 1 details the bonding estimates. <br />If you have any questions, please do not hesitate to call Mike Kolin or me. <br />Sincere/l~y, <br />David M. Stout <br />Enviromental Coordinator <br />Enclosure <br />DM11S/cs <br />cc: Mike Kolin <br />Jack Snow <br /> <br />