Laserfiche WebLink
<br />page 2 of letter to H. B..Ranney, MLR <br />2.05.4 (2) (b) Reclamation Cost Estimate <br />No response needed. <br />2.05.4 (2) (d) Topsoil (Redistribution) <br />On page 108 of the Permit Application, a statement is added referencing <br />The Caterpillar Performance Handbook for topsoil swelling. The Handbook <br />uses a swell factor of 30%. Eastside used a swell factor of 20%, allowing <br />a 10% compaction factor for settling and slight compaction during <br />placement of the topsoil. .Pages 108 and 109 .have_been.revised and enclosed <br />2.05.6.(6) Subsidence Survey, Monitoring, and Control Plan <br />Addressed in ECC letter dated August 10, 1989. <br />All stipulations to: the Permit Application are in compliance. <br />Sincerely, <br />Linda Limbach <br />Eastside Coal Company, Inc. <br />/11 <br />Enclosures <br />