Laserfiche WebLink
CONTRACTOR shall repair all weather related damage to Soil Liner Fill <br />surfaces or other portions of the Work that have or have not been covered <br />by geomembrane, at no additional cost io CC&V. <br />If any moisture is allowed to collect under the geomembrane prior to or <br />after final seaming and softens the Soil Liner Fill, the geomembrane shall <br />be removed and CONTRACTOR shall recondition and recompact the Soil <br />Liner Fill to meet all placement and trimming SPECIFICATIONS, at no <br />additional cost io CC&V. <br />16. CONTRACTOR shall remove all hubs and survey stakes in the Soil Liner Fifl <br />and backfill all holes with MANAGER and CER7IFYING ENGINEER <br />approved moisture-conditioned Soil Liner Fill or bentonite. Compact with a <br />Proctor hammer or other suitable device that will achieve a kneading type <br />of compaction and will achieve the required density. <br />17. CONTRACTOR shall verify the final thickness of Soil Liner Fill to determine <br />compliance with this SPECIFICATION. Thickness verification shall be <br />performed at a minimum frequency of two measurements per acre using a <br />soil coring device, unless directed otherwise by MANAGER. <br />CONTRACTOR shall record as part of the as-built documentation the <br />location, elevation, and thickness of each Soil Liner Fill verification test. <br />COA Monitor will witness all verification measurements. CONTRACTOR <br />shall backfill all holes with MANAGER and CERTIFYING ENGINEER <br />approved moisture-conditioned Soil liner Fill compacted with a Proctor <br />hammer or other suitable device that will achieve a kneading type of <br />compaction and will achieve the required density, or bentonite. Areas <br />with deficiencies shall be reworked by CONTRACTOR, until acceptable <br />measurements are obtained at no additional cast to CC&V. <br />18. If tests indicate the Work does not meet the requirements of the <br />SPECIFICATIONS, MANAGER and CERTIFYING ENGINEER will establish <br />the extent of the nonconforming area. The nonconforming area shall be <br />reworked by CONTRACTOR until acceptable test results are obtained at no <br />additional cost to CC&V <br />19. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be <br />tested by COA Monitor. No geosynthetics will be allowed to be placed on <br />frozen material, as defined in Section 3.06, without the area in question <br />being retested by the COA Monitor. <br />G. Drain Cover Fill <br />Drain Cover Fill shall be placed over the geomembrane in the locations <br />shown on the DRAWINGS. <br />2. Prior to placing tha Drain Cover FiII, CONTRACTOR shall verify by visual <br />inspection that the underlying geosynthetics are free of holes, tears, <br />wrinkles, ar foreign objects. MANAGER and CEFtTIFY1NG ENGINEER will <br />inspect tha geosynthetic for wrinkles prior to placement of Drain Cover Fill. <br />As instructed by MANAGER, CONTRACTOR shall 'work out' wrinkles to <br />the satisfaction of MANAGER and CERTIFYING ENGINEER prior to <br />placement of the Drain Cover Fill. In all cases, wrinkles shall not be of a <br />size that they could fold back on themselves. Wrinkles greater than one <br />foot shalt be removed and repaired by the INSTALLER. <br />Section 02200 Page 13 of 15 March Z, 1999 <br />Earthworks Golder Assodafes Revision 6 <br />