3. CONTRACTOR shall place Drain Cover Fill in a single 24-inch loose lift. <br />The tracked equipment shall operate only over previously-placed Drain <br />Cover Fill. CONTRACTOR shall not operate equipment directly on <br />geosynthetics. Only a dozer with a ground pressure not exceeding 8.7 psi <br />can be used to place Drain Cover Fill. A CAT 12G motor grader, or <br />equivalent approved by CERTIFYING ENGINEER, can be used for Drain <br />Cover Fill final grading. Equipment used for placement will not be allowed <br />[o pivot on one track (i.e., no abrupt or sharp turnsl. There shall be no <br />downhill placement on slopes steeper than 4H:1 V. Material can be placed <br />along contours if buttressed from below. Motor graders shall not be <br />allowed to make abrupt turns, brake suddenly, or dig blade in which <br />results in the tires spinning on the Drain Cover Fill surface. <br />4. Highway compatible Rubber tired construction equipment shall not be <br />allowed to travel over the geomembrane or on top of Solution Collection <br />piping unless a thickness of at least 45 inches of Drain Cover Fill has been <br />placed over the geomembrane and on [op of Solution Collection piping. <br />The CONTRACTOR will be required to demonstrate to the MANAGER, <br />DESIGN ENGINEER and CERTIFYING ENGINEER that the equipment and <br />procedures used are not detrimental to the geomembrane and piping, at no <br />cast to CC&V. Off road haul truck traffic shall require a minimum of 60 <br />inches for Cat 773 (or equivalent) of Drain Cover Fill placed over the <br />geomembrane and solution collection piping, and a minimum of 120 inches <br />for CAT 777 for equivalent) of Drain Cover Fill placed over the <br />geomembrane and solution collection piping. <br />5. When placing Drain Cover Fill the maximum acceptable drop height is 3 <br />feet. <br />6. CONTRACTOR shall operate equipment in a manner that is protective of <br />underlying geosynthetics. If MANAGER or CERTIFYING ENGINEER <br />suspects the occurrence of any damage to the underlying geosynthetics, <br />MANAGER will instruct CONTRACTOR to remove Drain Cover Fill to <br />expose the geosynthetics. CONTRACTOR shall uncover, repair any <br />observed damage of the underlying geosynthetics, in accordance with the <br />repair requirements of Sections 02776.0 and 02777.0 of these <br />SPECIFICATIONS, and recover, at no cost to CC&V. <br />7. CONTRACTOR shall place Drain Cover Fill at a rate such that no single <br />area of 350,000 square feet of geomembrane liner is exposed to <br />ultraviolet light for more than 180 days. <br />8. CONTRACTOR shall provide close continuous monitoring at the point of <br />placement during the placement of the Drain Cover Fill over geosynthetics. <br />9. CONTRACTOR shall verify the final thickness of Drain Cover Fill to <br />determine compliance with this SPECIFICATION. CONTRACTOR shall <br />record verification location, elevation, and thickness. CQA Monitor shall <br />witness all verification measurements. CONTRACTOR will submit a <br />method of verifying Drain Cover Fill depth to MANAGER for approval. <br />Grade markers shall be placed an a 50 foot by 50 foot grid with additional <br />points required for breaks in grade. CONTRACTOR shall remove all grade <br />markers under supervision of COA Monitor after verification measurements <br />have been approved by MANAGER and CERTIFYING ENGINEER and will <br />hackfill holes with Drain Cover Fill. Areas with deficient thickness shall be <br />Section 02200 Page 14 of 15 March Z, 1999 <br />Earthworks GolderAssodates Revision 6 <br />