My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15278
DRMS
>
Back File Migration
>
Revision
>
REV15278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:34 AM
Creation date
11/21/2007 11:03:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
RELEVANT SECTIONS FROM FINAL REPORT CRESSON PROJECT QUALITY ASSURANCE MONITORING AND TEST RESULTS
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA <br />testing. Soil Liner Fill sampling shall be scheduled by CQA Monitor with <br />CONTRACTOR to facilitate CQA field testing. <br />9. CONTRACTOR shall maintain Soil Liner Fill stockpile areas in a free- <br />draining condition. The CONTRACTOR wilt maintain Soil Liner Fiil <br />stockpiles and Soil liner FiII placed within the limits of the Phase III valley <br />leach facility to prevent the drying out of [he surface. <br />10. CONTRACTOR shall compact corners and other areas inaccessible to <br />driven compaction equipment using hand-operated 500 pound vibratory <br />plate or vibratory smooth-drum compaction equipment approved by <br />MANAGER and CERTIFYING ENGINEER. <br />11. CONTRACTOR shall trim the surface of the Soil Liner Fill to the design <br />grades shown on the DRAWINGS. <br />12. CONTRACTOR shall roll the surface of the Soil Liner Fip with a smooth <br />drum roller to remove ridges and surface irregularities greater than 0.5 <br />inches in height. CERTIFYING ENGINEER shall determine if surface <br />preparation is sufficient to place geomembrane. On areas with slopes <br />steeper than 3H:1 V, CONTRACTOR shall adopt methods as necessary to <br />obtain the same final surface preparations that would be obtained by the <br />passage of a smooth-drum roller on flat or level ground. Pushing of <br />compaction equipment by tracked equipment shall not be performed. <br />Wheel ruts on the surface of the Soil Liner Fill from grading equipment <br />shall be repaired by CONTRACTOR prior to placement of the <br />geomembrane by rolling the surface or placing and compacting tailings as <br />approved by CQA Monitor. <br />13. CONTRACTOR will remove angular protruding rocks greater than 3/4 <br />inches in diameter from the compacted Soil Liner Fill surface. Indentations <br />left in the Soil Liner Fill Surface after removal of the rocks shall be filled <br />with either Soil Liner Fill or tailings approved by CQA Monitor, and <br />compacted to achieve final grade. Areas of the Soil Liner Fill surface with <br />concentrated gravelly areas will have tailings approved by COA Monitor <br />placed on top and compacted to achieve final grade, A maximum <br />thickness of 0.5 inches of tailings will be placed on the Soil Liner Fill, with <br />no more than 60 percent of the Soil Liner Fill surface being covered by <br />tailings. <br />14. MANAGER and CERTIFYING ENGINEER will identity any areas of <br />significant desiccation, crusting or erosion of a lift surface. Soil Liner Fill <br />surfaces found to have desiccation cracks greater than 0.25-inches in <br />width or depth, or which exhibit swelling, heaving or other similar <br />conditions shall be replaced or reworked by CONTRACTOR to remove <br />such detects. Desiccation sacks an the Soil Liner Fill surface less than <br />0.25-inches in width or depth shall be compacted with a smooth drum <br />roller. CONTRACTOR shall take whatever steps necessary to prepare Soil <br />liner Fill surface to the satisfaction of MANAGER and CERTIFYING <br />ENGINEER, at no additional cost to CC&Y, <br />15. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition <br />suitable for geomembrane installation as specified in these <br />SPECIFICATIONS and in the CQA Plan until the surface is covered. <br />Section 02200 Page 12 of 15 March 2, 1999 <br />Earthworks Golder Assodates Aevision 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.