2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that <br />does not cause rutting or other deleterious effects. <br />F. Soil Liner Fill <br />1. Soil Liner Fill shall be placed within the limits of the valley leach facility as <br />shown on the DRAWINGS and shall begin only after completion of all, or <br />MANAGER and CERTIFYING ENGINEER approved portion of, excava[ion <br />and Structural Fill placement in the valley leach facility. <br />2. Material from Arear No. 2 or the area above the Prill Silo used for Soil Liner <br />Fill will be processed by the CONTRACTOR to meet project speccfications . <br />3. CONTRACTOR shall process, place and compact the Soil Liner FII to <br />achieve a coefficient of permeability of less than 1x10'6 cm/sec, measured <br />according to ASTM Method D5084, Method D. Any Soil Liner Fill no[ <br />meeting the permeability specification shall be removed and replaced with <br />material meeting the permeability specification, at no additional cost to <br />CC$ V. <br />4. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such <br />that the compacted lift thickness is a minimum of 12-inches. <br />5. CONTRACTOR shall compact the Soil Liner Fill to at least 95 percent of <br />the maximum dry density as determined by the Standard Proctor density <br />test (ASTM D6981. Area No. 2 material shall be compacted at a moisture <br />content between 3 percent below and at optimum moisture content. The <br />moisture content and density shall be uniform throughout the lift. If the <br />Soil Liner Fill cannot be conditioned to meet the placement specifications, <br />the material shall be removed and replaced with new Soil Liner FiII at the <br />CONTRACTOR's expense. The CONTRACTOR shall reduce the clod size <br />of the soil liner fill to a size that is acceptable to the CERTIFYING <br />ENGINEER, the method by which will be approved by CERTIFYING <br />ENGINEER and MANAGER prior to implementation. <br />6. The moisture content of the Soil Liner FI! shall be uniform throughout prior <br />to and during compaction of the material. CONTRACTOR shall be <br />responsible for meeting moisture content and compaction <br />SPECIFICATIONS. If the Soil Liner Fill cannot be conditioned to meet the <br />placement SPECIFICATIONS, the material shall be removed and replaced <br />with new Soil Liner Fill at no additional cost to CC&V. MANAGER may <br />require CONTRACTOR to moisture condition Soil Liner Fill at stockpile at <br />least 24 hours prior to the Soil Liner Fill being broughUplaced within the <br />Phase III valley leach facility limiu. <br />7. CONTRACTOR shalt place Soif Liner Fifl to form a continuous monolithic <br />material. If a lift of compacted Seil Liner Fill dries out during placement <br />operations, CONTRACTOR shall scarify, moisture condition the dry soil <br />and recompact the lift. If a lift of compacted Sail Liner Filt becomes overly <br />wet due to precipitation or over watering, CONTRACTOR shall allow the <br />wet soil to dry to the specified moisture content range before <br />recompaction of fill and placement of geasyrtthetic materials. <br />Section OZZ00 Page 7 7 of 75 March 2, 1999 <br />Earthworks Gilder Assodates Revision 6 <br />