My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV15278
DRMS
>
Back File Migration
>
Revision
>
REV15278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:26:34 AM
Creation date
11/21/2007 11:03:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
RELEVANT SECTIONS FROM FINAL REPORT CRESSON PROJECT QUALITY ASSURANCE MONITORING AND TEST RESULTS
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Select Structural Fill <br />Select Structural Fill shall be placed for miscellaneous site grading as <br />required by the MANAGER and CERTIFYING ENGINEER. <br />2. CONTRACTOR shall condition Select Structural Fill to a moisture content <br />that allows compaction to the required density and that results in a firm; <br />unyielding surface capable of allowing the movement of vehicles and <br />equipment over the surface without causing rutting or other deleterious <br />effects. <br />3. CONTRACTOR shall place Select Structural Fill materials with less than 30 <br />percent rock materials above 3l4-inch size in maximum 12-inch loose lifts, <br />and compacted to 95 percent of maximum dry density (ASTM D6981. <br />4. CONTRACTOR shall condition and place Select Structural Fill containing <br />more than 30 percent rock materials above 3/4-inch size frock fill) in <br />maximum 12-inch loose lihs and compact by a method compaction <br />technique. The compaction equipment shall consist of a minimum ten 10- <br />ton Istatic drum weight) vibratory smooth-drum compactor. The number <br />of passes shall be subject to CERTIFYING ENGINEER'S approval, at no <br />additional cost to CC&V, The method SPECIFICATIONS may be changed <br />at any time, at the discretion of CERTIFYING ENGINEER, based upon <br />changes in material characteristics, field conditions, and/or compaction <br />equipment. <br />D. Underdrain Fill <br />1. Underdrain Fill shall be placed in the Secondary and Tertiary Underdrains <br />as shown in the DRAWINGS. <br />2. CONTRACTOR shall condition Underdrain Fill that results in a firm, <br />unyielding surface capable of allowing the movement of vehicles and <br />equipment over the surface without causing rutting or other deleterious <br />effects. <br />3. CONTRACTOR shall condition, place and compact Underdrain Fill by a <br />method compaction technique. The compaction equipment shall consist <br />of a minimum 10-ton (static drum weight) vibratory smooth-drum <br />compactor. The number of passes and loose lift thickness shall be subject <br />to CERTIFYING ENGINEER'S approval, at no additional cost to CC&V. The <br />method SPECIFICATIONS may be changed at any time, at the discretion of <br />MANAGER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />4. Provisions shall be made by CONTRACTOR for removal of oversize <br />materials from fills, at no additional cost to CC&V. <br />5. The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />1. Leak Detection Fitl shall be placed in the Leak Detection Trenches as <br />shown on the DRAWINGS. <br />Section 02200 Page 10 of 15 March 2, 1999 <br />Earthworks Golder Assodafes Revision 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.