Laserfiche WebLink
C. Select Structural Fill <br />Select Structural Fill shall be placed for miscellaneous site grading as <br />required by the MANAGER and CERTIFYING ENGINEER. <br />2. CONTRACTOR shall condition Select Structural Fill to a moisture content <br />that allows compaction to the required density and that results in a firm; <br />unyielding surface capable of allowing the movement of vehicles and <br />equipment over the surface without causing rutting or other deleterious <br />effects. <br />3. CONTRACTOR shall place Select Structural Fill materials with less than 30 <br />percent rock materials above 3l4-inch size in maximum 12-inch loose lifts, <br />and compacted to 95 percent of maximum dry density (ASTM D6981. <br />4. CONTRACTOR shall condition and place Select Structural Fill containing <br />more than 30 percent rock materials above 3/4-inch size frock fill) in <br />maximum 12-inch loose lihs and compact by a method compaction <br />technique. The compaction equipment shall consist of a minimum ten 10- <br />ton Istatic drum weight) vibratory smooth-drum compactor. The number <br />of passes shall be subject to CERTIFYING ENGINEER'S approval, at no <br />additional cost to CC&V, The method SPECIFICATIONS may be changed <br />at any time, at the discretion of CERTIFYING ENGINEER, based upon <br />changes in material characteristics, field conditions, and/or compaction <br />equipment. <br />D. Underdrain Fill <br />1. Underdrain Fill shall be placed in the Secondary and Tertiary Underdrains <br />as shown in the DRAWINGS. <br />2. CONTRACTOR shall condition Underdrain Fill that results in a firm, <br />unyielding surface capable of allowing the movement of vehicles and <br />equipment over the surface without causing rutting or other deleterious <br />effects. <br />3. CONTRACTOR shall condition, place and compact Underdrain Fill by a <br />method compaction technique. The compaction equipment shall consist <br />of a minimum 10-ton (static drum weight) vibratory smooth-drum <br />compactor. The number of passes and loose lift thickness shall be subject <br />to CERTIFYING ENGINEER'S approval, at no additional cost to CC&V. The <br />method SPECIFICATIONS may be changed at any time, at the discretion of <br />MANAGER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />4. Provisions shall be made by CONTRACTOR for removal of oversize <br />materials from fills, at no additional cost to CC&V. <br />5. The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />1. Leak Detection Fitl shall be placed in the Leak Detection Trenches as <br />shown on the DRAWINGS. <br />Section 02200 Page 10 of 15 March 2, 1999 <br />Earthworks Golder Assodafes Revision 6 <br />