Laserfiche WebLink
CIRCES Cost Estimatinsl Software <br />PROJECT IDENTIFICATION <br />Task#: 001 <br />Date : 03/22/2007 <br />User: ESC <br />Agency or organization name :ORMS <br />Permit ar other job action :Surety Increase <br />Task description : Backfill 8 Grade Quarries 1 8 2 <br /><: <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes ll - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3shank ripper <br /> Data source : (CRG) <br /> Utilization °~ <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br /> Operating cosUhour : $73.75 100 <br /> Ripper op. costlhour : $1.71 25 <br /> Operator costlhour : $32.78 NA <br /> Total unit cosUhour : $166.49 Total fleet cosUhour : 5188.49 <br />- <br />MATERIAL QUANTITIES ,; ,: :. <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.215 volume : 8,075 LCY <br /> <br />Source of estimated volume :ORMS Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Matedal consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description -: Job efficiency : 0.83 (1 shifr/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rQ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,500 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.35 <br />Weight descdption <br />Decomvosed rock - 75 % Rock. 25% Eadh <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.756 /LCY <br />State :Colorado <br />County:Ladmer <br />Site :Indio Red #1 And #2 <br />Adjusted unit production : 220.08 LCY/hr <br />Adjusted fleet production : <br />____ _._. 220.08 LCY/hr <br />Total job time : 27.80 Hours <br />Total job cost : 54,598 <br />PenniUjob# :M-1999-082 <br />Abbreviation :none <br />Filename : M062-001 <br />