My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-26_REVISION - M1999062
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999062
>
2007-03-26_REVISION - M1999062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:40 AM
Creation date
11/21/2007 11:00:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999062
IBM Index Class Name
Revision
Doc Date
3/26/2007
Doc Name
Notification of Increase in Bond
From
DRMS
To
Abe Vasquez
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Date : 23-Mar-2007 Permit or job no.: 111999-062 Site :Indio Red #1 And #2 <br />User : ESC Abbreviation : none State : Colorado <br /> Filename : M062-000 County : Lorimer <br /> Agency or organization name :ORMS <br /> Permit or job action :Surety Increase <br />'ASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -BacMli and Grade Quarries 1 & 2 dozer 1 27.6 $4,596 <br />002 -Replace Topsoil on Affected Area dozer 1 6.4 $1,055 <br />003 -Revegetate Distufied Area revege 2 40.0 $2, 726 <br />004 -Mobilization/Demobilization mobilize 1 4.8 $2,065 <br />inGudes inflation factor adjustment of: NA <br />SUBTOTALS: 78.8 <br />TOTAL DIRECT COST <br />OVERHEAD ANO PROFIT - Liability IDSUranCe : 2.02 % 01 d%rect total = $211 <br />Performance bond : 1.05 % of direct total = $110 <br />Job superintendent : NA' NA NA total = NA <br />Profit: 10.00 %o/direct total= $1,044 <br />• not requin:d (or eqp. operator serves as super) TOTAL O 8 P = $1,365 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (tlired~08P)= $11,807 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management andlor administration : 5.00 % of colt. NA total = $590 <br />CONTINGENCY • NA' NA total = NA <br />"contingencies accounted for of fask level 70TAL INDIRECT COS7= $1,955 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $12,397 <br />
The URL can be used to link to this page
Your browser does not support the video tag.