Laserfiche WebLink
CIRCES Cost Estimating Software <br />PRO~CT IDENTIFICATION <br />Task # : 002 State :Colorado PermiUjob# : M-1999-062 <br />Date : 03/22/2007 County :Ladmer Abbreviation : none <br />User : ESC Site :Indio Red #1 And #2 Filename : M062-002 <br /> <br />Agency or organization name : DRMS <br />Permit or other job action :Surety Increase <br />Task description :Replace Topsoil on Affected Areas <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series ll - 8SU (200: Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $58.24 NA <br /> Operating cosVhour : $73.75 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $164.77 Total fleet cosUhour : x164.77 <br />;::: : ;: <br />MATERIAL QUANTITIES ;: :: ;:I <br />Initial Swell Loose <br />volume : 1,210 CCY factor : 1.125 volume : 1,361 LCY <br />Source of estimated volume :Average 3"topsoil <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION ,. <br /><, ,: __.< <br />Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hcudy production : 491.9 LCY/hr <br />Material consistency description <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 25% Rock, <br />JOB TIME AND COST <br />Fleet size <br />0.00 % (pos) <br />Unit cost : $0.775 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production : 212.54 LCY/hr <br />Adjusted fleet production : 212.54 LCY/hr <br />Total job time : 8.40 Hours <br />Total job cost : x1,055 <br />